Control Group 25

Step “Ready”

Group has the ability to re-start, if step 4 “Ready” is active. Step Ready, is
active, until Group (restart) is started again. When step Ready is active, there is
a blue indication on the HMI Control- Group Popup. If the Group is restarted
with the Start button, it jumps directly to step 1 “Startup”. During this
re-starting situation, the Automatic Signal “EnAuto(X/Y)” is always true.
Only the Signal “EnAutoStart”, stays false during step 1+2 (Startup+Waiting)
and will pass over to true, if you remain at step 3 “Starting”.

The step controller not only increments steps consecutively, but may switch
(jump) to any step, in order to set a status, that complies with the new
situation. As an example, an operator Immediate Stop will, regardless of the
current status, immediately select status 0 and shutdown any control within the
group. The table below shows the additional jumps.

Start

Ready

Failure

Normal Stop

Fast Stop

Start Button

OR

Restart

Loss of last drive

AllRun=0

OR

PartRun=1

OR

Starting Pause

OR

Starting Times Out

If Parameter

FailureStopDisable=1

AND

Failure=1

Stop Button=1

OR

IntlStop.0.. 7=1

OR

FailureStopDisable=0

AND

Failure=1

ImmStop=1

OR

IntlImmStop.0..7=1;

OR

PowerDip