2 installation, 1 about this chapter, 2 initial installation – Metrohm 850 Professional IC Anion MCS Prep 3 User Manual

Page 19: About this chapter, Initial installation

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

2 Installation

850 Professional IC –Anion – MCS – Prep 3

■■■■■■■■

9

2 Installation

2.1

About this chapter

The Installation chapter contains

a list of all the steps to be carried out during the initial installation (see
Chapter 2.2, page 9)
.

a schematic overview of the flow paths (see Chapter 2.3, page 10).

a description of the construction, connections and functionality of the
instrument.

step-by-step installation instructions. A part of these installation tasks
has already been carried out before delivery. They are nevertheless
described here in case they need to be carried out once again some
time in the future (e.g. after maintenance of the high pressure pump).

2.2

Initial installation

Note

A large number of the capillary connections are already connected at
the time the instrument is delivered.

The following steps still have to be carried out after delivery:

1 Setting up the instrument (see Chapter 2.4, page 13).

2 Remove handle and rollers (see Chapter 2.6.1, page 15).

3 Place the detector in the instrument and connect it (see Chapter

2.6.2, page 18).

4 Remove transport securing devices (see Chapter 2.6.3, page 20).

5 Connect the leak sensor (see Chapter 2.6.4, page 20).

6 Connect drainage tubings (see Chapter 2.6.5, page 21).

7 Connect the eluent bottle (see Chapter 2.8.1, page 26).

Advertising