Figure 8, Drainage tubing – Metrohm 850 Professional IC Anion MCS Prep 3 User Manual
Page 32
Advertising

2.6 Rear of the instrument
■■■■■■■■■■■■■■■■■■■■■■
22
■■■■■■■■
850 Professional IC –Anion – MCS – Prep 3
2
4
5
6
1
3
7
9
8
Figure 8
Drainage tubing
1
Drainage tubing connection
For draining escaped fluid from the covering
plate.
2
Drainage tubing
Section of the 6.1816.020 silicon tubing. For
draining escaped fluid from the covering
plate.
3
Drainage tubing connection
For draining escaped fluid from the detector
chamber.
4
Drainage tubing
Section of the 6.1816.020 silicon tubing. For
draining escaped fluid from the detector
chamber.
5
Y connector 6.1807.010
For connecting the two drainage tubings
(8-
6
Drainage tubing
Section of the 6.1816.020 silicon tubing.
Guides escaped fluid to the leak sensor.
Advertising