Figure 50, Components of the inlet valve and outlet valve – Metrohm 850 Professional IC Anion MCS Prep 3 User Manual

Page 95

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

4 Operation and maintenance

850 Professional IC –Anion – MCS – Prep 3

■■■■■■■■

85

1

2

3

5

6

7

8

9

10

9

8

7

10

5

4

6

Figure 50

Components of the inlet valve and outlet valve

1

Inlet valve 6.2824.170

2

Outlet valve 6.2824.160

3

Inlet valve housing

4

Outlet valve housing

5

Sealing ring (black)

6

Sleeve

7

Sapphire sleeve
The shiny side must point to ruby ball.

8

Ruby ball

9

Ceramic holder for ruby ball

10 Seal

The larger opening must point outwards.

4 Clean the components of the valve

Rinse the valve components with ultra pure water and/or acetone
and dry with a lint-free cloth.

5 Reassemble the valve

Reassemble valve components according to figure 50, page 85.

■

Insert the seal with the larger opening faced downwards into the
recess of the tool.

■

Lay the other valve components above another in the correct
sequence (see Figure 50, page 85).

Advertising