6 connecting the eluent degasser, 7 installing the high-pressure pump, Connecting the eluent degasser – Metrohm 930 Compact IC Flex ChS/PP/Deg User Manual
Page 32: Installing the high-pressure pump

3.6 Connecting the eluent degasser
■■■■■■■■■■■■■■■■■■■■■■
24
■■■■■■■■
930 Compact IC Flex ChS/PP/Deg (2.930.1360)
3.6
Connecting the eluent degasser
The high-pressure pump cannot generate uniform flow if the eluent con-
tains small gas bubbles or dissolved gas. As a result, the baseline cannot
be stabilized correctly. In order to achieve good measurement results, the
eluent has to be degassed before it goes into the high-pressure pump.
The eluent degasser is completely connected. No installation work is
required.
3.7
Installing the high-pressure pump
The intelligent and low-pulsation high-pressure pump pumps the eluent
through the system. It is equipped with a chip where its technical specifi-
cations and "life history" (operating hours, service data, etc.) are saved.
The high-pressure pump consists of:
■
The pump head, which pumps the eluent through the system.
■
The purge valve used for bleeding the pump head.