Main Tasks to Complete

Step 5

Add a Test tool to
receive a positive

1. In the PresencePLUS GUI, click the Analysis Tools tab.
2. Click the Test tool button.

confirmation that the

3. Select Coordinate Tool (COORD_1) from the Input 1 drop-down list.

inspection ran
successfully; that is,
the part was found.

4. Click on the Coordinate Tool (COORD_1) tab and make sure that the checkmark

next to the X-Coordinate value checked. Enter 0 (zero) in the Min column and a
large number (e.g., 1000) in the Max column.

Note: These settings will cause the Test tool to pass all resulting X values,
but fail if the X value is invalid (that is, if the part is not found).

5. Uncheck other values.