4.02 Preparations for Operation

At the start of each operating session:

WARNING

Disconnect primary power at the source be-

fore assembling or disassembling power sup-

ply, torch parts, or torch and leads assemblies.

Torch Parts Selection

Check the torch for proper assembly and appropriate

torch parts. The torch parts must correspond with

the type of operation, and with the amperage output

of this Power Supply (60 amps maximum). Refer to

Section 4T.07 and following for torch parts selection.

Torch Connection

Check that the torch is properly connected. Only

Thermal Dynamics model SL60 / Manual or SL100 /

Mechanical Torches may be connected to this Power

Supply. See Section 3T of this manual.

Check Primary Input Power Source

1. Check the power source for proper input volt-

age. Make sure the input power source meets

the power requirements for the unit per Section

2, Specifications.

2. Connect the input power cable (or close the

main disconnect switch) to supply power to the

system.

Air Source

Ensure source meets requirements (refer to

Section

2). Check connections and turn air supply ON.

Connect Work Cable

Clamp the work cable to the workpiece or cutting

table. The area must be free from oil, paint and rust.

Connect only to the main part of the workpiece; do

not connect to the part to be cut off.

Art # A-04509

Power ON

Place the Power Supply ON / OFF switch to the ON

(up) position. AC indicator

turns ON. Gas

indicator turns ON if there is sufficient gas pres-

sure for power supply operation and the cooling

fans turn ON.

NOTE

Minimum pressure for power supply op-

eration is lower than minimum for torch

operation.
The cooling fans will turn ON as soon as the

unit is turned ON. After the unit is idle for

ten (10) minutes the fans will turn OFF. The

fans will come back ON as soon as the torch

switch (Start Signal) is activated or if the unit

is turned OFF, then turned ON again. If an

over temperature condition occurs, the fans

will continue to run while the condition ex-

ists and for a ten (10) minute period once the

condition is cleared.

Set Operating Pressure

1. Place the Power Supply Function Control knob

to the SET

position. Gas will flow.

2. For Standoff cutting, adjust gas pressure from 70

- 85 psi / 4.8 - 5.9 bar (LED's in center of control

panel). Refer to the Standoff chart for pressure

setting details.

A

+

PSI

BAR

MAX

MAX

MIN

MIN

!

1

2

Art# A-07946

MIN

MAX