14 gas control module installation, Gas control module installation -17, Ultra-cut 200 xt – Tweco 200 XT Ultra-Cut Plasma Cutting System User Manual

Page 41

Advertising
background image

ULTRA-CUT 200 XT

Manual 0-5273

INSTALLATION

3-17

3.14 Gas Control Module Installation

The Gas Control Module must be installed in a suitable location where it is easily accessible to the system operator.

The unit must be mounted to a flat horizontal surface. If the Module is mounted to a gantry or to any other support

subject to vibration or motion, the installer must fasten the module to the support securely.

The Module should be located as far away as possible from the Arc Starter due to electromagnetic interference. It

is acceptable to locate the control cable in the same track as the cables from the Arc Starter.

The Module includes feet which lift the bottom panel off the mounting surface. There are ventilation holes on the

bottom panel; the space between the bottom panel and the mounting surface must remain open for ventilating air

to enter the module. Louvers on the back panel of the module must also remain unblocked, for the free passage

of ventilating air.

Mounting Dimensions

NOTE

Height not shown is 14.125” (359 mm)

Art # A-07962

8.50”

215.90mm

0.28”

7.14mm

11.00”

279.40mm

16.18”

410.97mm

13.68”

347.47mm

Gas Box

Advertising