4.05 GCM 2010 First Time Operation Matching Gas Control to Lead Length

For initial operation of GCM2010 with software version 2.1 or later.

1. Before applying AC power set the Power Supply ENABLE/DISABLE switch on the gas control module to DISABLE.

2. Set Gas Selection switch to the correct position for cutting process being used.

3. Turn on AC power and set Power Supply ENABLE/DISABLE switch to ENABLE. After a short delay to establish commu-

nications, the gas control will start the Purge and priming sequence. (If torch and coolant leads were not already full of

coolant you may be required to repeat this power on cycle and add coolant until the priming is complete).

4. Once the purge sequence is finished set the Mode Switch between Run and Set Precharge. Display says “SET HOSE

LENGTH” on the first line and LENGTH xxx FEET on the second. The xxx is most likely the factory default of 175’ which

is the system maximum.

5. Press in and hold the Current Control knob. Display changes to SELECT HOSE LENGTH and second line steps downwards

from 175’ to 50’ in 25’ increments. As soon as the correct length is displayed, release the knob.

6. Set the Mode Switch back to Run.

7. The initial/first time set up is complete and does not have to be done again unless the Gas Control or it’s main PC Board

is replaced.

4.06 GCM 2010 Sequence Of Operation

For first time operation see previous steps, “First Time Operation...”

1. Set the Plasma Power Supply Enable / Disable switch to Disable.

DANGER

Always shut off input power to the system before changing or inspecting torch parts.

a. Change the torch parts if necessary.

b. Set the Plasma Power Supply Enable / Disable switch (on the Gas Control Module) to Enable. The Module performs

purges of 15 seconds, 11 seconds, and another 11 seconds. This removes water from the torch parts.

2. Select the desired plasma and shield gas by setting the Gas Selection switch to the desired position. 2 seconds after

gas selection, the module purges the new gas(es) through the leads.

3. Set the preflow gas pressure.

a. Set the MODE switch to SET PREFLOW.

b. Use the PREFLOW control knob to set preflow gas pressure. Refer to the torch manual for pressure settings.

4. Set the plasma and shield gas pressures and flows.

a. Set the MODE switch to SET PLASMA & SHIELD.

b. Use the PLASMA and SHIELD control knobs, pressure gauges, and flow meters to set plasma and shield gas pres-

sures and flows. Refer to the torch manual for pressure settings.

c. In installations using water shield, use the H

2

O MIST control knob and flow meter to set water flow rate. Refer to the

torch manual for flow rates.

5. Use the AMPERAGE SET-UP control knob to set the desired amperage output. The module will update the amperage

every 2 seconds after the last adjustment to the knob. The module keeps the set point in memory.

6. Place the MODE switch to the RUN position.

7. Set the Plasma Power Supply Enable / Disableswitch (on the Gas Control Module) to Enable. The Module performs

purges of 15 seconds, 11 seconds, and another 11 seconds. This removes water from the torch parts.