Installation/setup transmig 250i – Tweco 250i Multi Process Welding Inverter 2RT Wire Feeder User Manual
Page 37
Advertising
INSTALLATION/SETUP
TRANSMIG 250i
Manual 0-5187
3-19 INSTALLATION/SETUP
3 Nuts
3 Studs
Art # A-10337
Front
2nd
1st
These holes are not used
Figure 3-12: Mounting Welder to Roll Cage.
5. First, use the 3 nuts (included) and secure the power source to the roll cage. Second, attach the front roll bar
and secure all hardware now. When you are done it should look like the first part of Figure 3-13.
6. Attach the Cross Bar to the front and rear roll bars with hardware shown and the bracket with the screw from
the top of the welder cover removed earlier. See Figure 3-13.
Art # A-10325
Cross Bar
Figure 3-13: Roll Cage Cross Bar Fitted
Advertising