3.20 Input And Output Wire Guide Installation

NOTE

0.9mm / 1.2mm feed rolls and guides are installed from the factory. Other sizes need to be purchased

separately.

Input Wire Guide - Install (the shorter one) by loosening the input guide lockscrew and inserting the guide into the hole

in the feedhead assembly. Adjust the guide so that it is clear of the feed rolls and tighten the input guide lockscrew.

NOTE

Before tightening the input and output guide lockscrews, install the drive roll to help in the alignment of

the wire guides.

Output Wire Guide - With the MIG Torch removed, loosen the adapter nut. This will aid with alignment. Install the

output wire guide (the longer one) by inserting the conical end part way into the Euro Adapter from the front of the

machine. Now install the MIG Torch pressing the output guide further in until the tip of the guide is as close to the

feed rolls as practical. Secure the MIG Torch. Tighten the adapter lock nut then tighten the output guide lockscrew.

NOTE

Gently strike the electrode on the work piece to generate a welding arc, and slowly move along the work

piece while holding a consistent arc length above base metal.

Art # A-10346

Input Guide Lockscrew

Output Guide Lockscrew

Input Wire Guide

Output Wire Guide

MIG Torch

Adapter Lock

Nut

Figure 3-24: Wire Guide Installation