Tweco Victor Thermal Dynamics Power Module Upgrade Kit User Manual

Page 4

Advertising
background image

4

Manual 0-5326

10. Reroute the cooling hose return from the lower position to the upper position. For 300 and 400 amp upgrades

use Figure 1B routing the hose behind the pilot board assembly and down from the inverter side down to

the coolant tank. Figure 1A 200A return hose routing. Figure 1B 300A and 400A return hose routing.

Art # A-12327

Figure 1a

Figure 1b

11. Run new power cables from inverter side to the coolant side. There should be about 9" of cable sticking out

of the grommet to connect to the inverter.

Art # A-12328