Unitec American Parking Equipment User Manual

Page 3

Advertising
background image

Document

Number:

GC1001

i

Document Title:

Unitec APE Gate and Gate Controller for Multi-Lane Applications Installation Guide

Table of Contents

1

Gate Installation with Gate Controller........................................................ 1

1.1

Electrical Planning .......................................................................................................... 1

1.1.1

Signal Wires ........................................................................................................... 1

1.1.2

Conduit Runs ......................................................................................................... 1

1.2

Mechanical Planning....................................................................................................... 2

1.3

Mechanical Installation ................................................................................................... 3

1.3.1

Gate Reset Loop .................................................................................................... 3

1.3.2

Merge Loop ............................................................................................................ 4

1.3.3

Installing the Gate .................................................................................................. 4

1.3.4

Installing the Gate Controller ................................................................................. 5

1.4

Electrical Installation ....................................................................................................... 6

1.4.1

Wire the AC power to the Gate Controller ............................................................. 6

1.4.2

Wire the WSII/Portal Units ..................................................................................... 7

2

Merge Zone Loop Guidelines.................................................................... 19

2.1

Installation of the Merge Zone Loop or Loops .............................................................. 19

2.1.1

Loop Placement ................................................................................................... 19

2.1.2

Determining the Number of Required Merge Loops ............................................ 20

2.2

Loop Installation Tips.................................................................................................... 22

2.2.1

Loop Wire Installation .......................................................................................... 22

2.3

Other Useful Information............................................................................................... 22

2.4

APE Gate Merge Loop Detector Card .......................................................................... 23

2.5

Wiring the Merge Zone Loop ........................................................................................ 24

3

Entry System Configuration ..................................................................... 27

3.1

Wash Select II Settings................................................................................................. 27

3.1.1

Enable Barrier Gate interface .............................................................................. 27

3.1.2

Tunnel Mode ........................................................................................................ 28

3.2

Portal TI Settings .......................................................................................................... 29

4

APE Gate Test-Out Procedure .................................................................. 31

5

System Test-Out Procedure...................................................................... 33

5.1

Testing System Interface for Lane 1............................................................................. 33

5.2

Testing System Interface for Lane 2............................................................................. 34

5.3

Testing System Interface for Lane 3............................................................................. 34

5.4

Testing System Interface for Lane 4............................................................................. 35

5.5

Test for Merge Area...................................................................................................... 36

6

Gate Frequency Settings........................................................................... 37

7

Gate Terminal Block Signal Definitions ................................................... 39

8

Gate Controller I/O Definitions ................................................................. 41

Advertising