Unitec American Parking Equipment User Manual

Page 47

Advertising
background image

Document

Number:

GC1001

43

Document Title:

Unitec APE Gate and Gate Controller for Multi-Lane Applications Installation Guide

Gate

Control

Signal name

Gate

Control

Terminal

Number

Gate

Control

PLC I/O

point

Device

Connection

Descriptive Use or

Operation

Open Gate 3

53

Y6

Output to Vend
Input of Gate at
Lane 3

Tied to the Vend input of the Gate,
This line will become 24VDC when
Gate 3is triggered to open. Note: This
is a sinking output. When testing,
reference from terminal 11(RED) to
Y6. When Y6 light is on, Terminal
53(Black) to 11(Red) should measure
24VDC

Open Gate 4

54

Y7

Output to Vend
Input of Gate at
Lane 4

Tied to the Vend input of the Gate,
This line will become 24VDC when
Gate 4 is triggered to open. Note:
This is a sinking output. When
testing, reference from terminal
11(RED) to Y7. When Y7 light is on,
Terminal 54(Black) to 11(Red) should
measure 24VDC

Ground G

N/A N/A

Electrical Ground

115V Line

L

N/A

N/A

115V Line (Hot)

115V Neutral

N

N/A

N/A

115V Neutral (Common

115V fused

5

N/A

N/A

Fused input power

24VDC
Regulated

6 N/A

N/A

Unfused 24VDC out of regulated PS

24VDC Fused
for PLC

F2 + N/A

Fused power for PLC

24VDC
Ground

10

-, C0, C1,
C0, C1

N/A

Ground (24VDC-) for PLC power and
communications signals

24VDC Fused
for External

11 V+ N/A

Fused 24VDC signal power for
communications signals

Advertising