2 testing system interface for lane 2, 3 testing system interface for lane 3, Testing system interface for lane 2 – Unitec American Parking Equipment User Manual

Page 38: Testing system interface for lane 3

Advertising
background image

Document

Number:

GC1001

34

Document Title:

Unitec APE Gate and Gate Controller for Multi-Lane Applications Installation Guide

10. After the gate for Lane 1 closes, the LCD screen on the Gate controller

should either show “Car in Merge area” (if you have a Merge loop
installed). Or “Idle/Scanning”

11. If you have connected the wash arming signals to your Tunnel controller,

you should verify a wash has been queued. If not, verify connections on
J17 of the WSII to the Tunnel controller.

Testing for Lane 1 is complete.

5.2 Testing System Interface for Lane 2

1. Remove any vehicles below all gate loops and merge loop.

2. Verify that all Gates have power and the gates are down. Gates should

be switched to Automatic mode.

3. Verify on the door of the Wash Select II that the “Wash In Use” LED is lit.

If not, check the wiring from Y1/Terminal 42 of the Gate controller and
terminal 11 to J18 of the WSII

4. Arm a wash at the Wash Select II in Lane 2.

5. Verify Gate at Lane 2 opens. If not, view the LCD screen on the PLC. If it

shows “IDLE/SCANNING” still, then it is not getting the signal into
X1/terminal 22 from the WSII. Check your wiring from the Gate Controller
to J19 of the Wash Select II. If it shows “Open Gate 2” then check the
wiring from the Gate Controller Y5/Terminal 52 to the Gate terminal strip.

6. If everything is operating correctly, X5 LED on the PLC should be lit and

the LCD on the Gate controller should show “Wait for Gate 2”. If not,
verify wiring from X5/Terminal 32 to the Gate terminal strip.

7. With the Gate for lane 2 open, drive a car through Lane 2. Validate that

the Gate lowers after the rear of the vehicle comfortably passes off the
Gate Loop. If not consult the Gate Controller manual for Gate loop
operation.

8. After the gate for Lane 2 closes, the LCD screen on the Gate controller

should either show “Car in Merge area” (if you have a Merge loop
installed). Or “Idle/Scanning”

9. If you have connected the wash arming signals to your Tunnel controller,

you should verify a wash has been queued. If not, verify connections on
J17 of the WSII to the Tunnel controller.

Testing for Lane 2 is complete.

5.3 Testing System Interface for Lane 3

1. Remove any vehicles below all gate loops and merge loop.

2. Verify that all Gates have power and the gates are down. Gates should

be switched to Automatic mode.

3. Verify on the door of the Wash Select II that the “Wash In Use” LED is lit.

If not, check the wiring from Y2/Terminal 43 of the Gate controller and
terminal 11 to J18 of the WSII

4. Arm a wash at the Wash Select II in Lane 3.

Advertising