Summary steps, Detailed steps – Cisco OL-7822-06 User Manual

Page 15

Advertising
background image

2-5

Cisco Service Control Engine 1000 2xGBE Quick Start Guide

OL-7822-06

Chapter 2 Rack-Mount the SCE 1000

Mount the System to the Rack

SUMMARY STEPS

1.

Make sure that the rack brakes are locked or that the rack is otherwise stabilized.

2.

Position the SCE 1000 so that the front end is closest to you, and lift it carefully to place it into the
rack. To prevent injury, avoid sudden twists or moves.

3.

Slide the SCE 1000 into the rack, pushing it back until the brackets (installed at the front of the SCE
1000) meet the mounting strips or posts on both sides of the rack.

4.

While keeping the brackets flush against the posts or mounting strips, align the holes in the brackets
with the holes on the rack or mounting strip.

5.

For each bracket, insert and tighten two appropriate screws to the rack.

DETAILED STEPS

Step 1

Make sure that the rack brakes are locked or that the rack is otherwise stabilized.

Figure 2-7

Sliding the SCE Platform into the Rack

Step 2

Position the SCE 1000 so that the front end is closest to you, and lift it carefully to place it into the rack.
To prevent injury, avoid sudden twists or moves.

Step 3

Slide the SCE 1000 into the rack, pushing it back until the brackets (installed at the front of the SCE
1000) meet the mounting strips or posts on both sides of the rack.

LINK RX

Cisco SCE 20

00 Series

4xGBE

TX

RX

MM

TX

LINK RX TX

RX

MM

TX

LINK RX TX

RX

MM

TX

LINK RX TX

RX

MM

TX

GBE-1

SUB

LINE

NET

PWR B STATU

S

PWR A

BYPASS

10/100/

1000

LINK/

ACTIVE

10/100/

1000

LINK/

ACTIVE

GBE-2

SUB LINE/CAS

CADE NET

AUX

CONSOLE

MNG 2

MNG 1

LINK RX TX

RX

MM

TX

LINK RX TX

RX

MM

TX

PWR B STATU

S

PWR A

BYPASS

10/100/

1000

LINK/

ACTIVE

10/100/

1000

LINK/

ACTIVE

AUX

CONSOLE

MNG 2

MNG 1

Cisco SC

E 1000

Series

2xGBE

GBE-1

SUB

LINE

NET

1

2

3

210419

Advertising