Transport checklist, Point row operation (option), Transport checklist point row operation (option) – Great Plains 3S-5000HDF Operator Manual User Manual

Page 41

Advertising
background image

Great Plains Manufacturing, Inc.

Table of Contents

Index

Operating Instructions

37

2012-08-14

Table of Contents

Index

195-325M

Transport Checklist

Before transporting the drill check the following items.
❑ Transport only with a tractor of proper size. See

Specifications and Capacities” on page 79

❑ Hitch drill securely to tractor. Always use a

locking-style pin sized to match holes in hitch and
drawbar (minimum of 1-inch diameter). See
Hitching Tractor to Drill” on page 20.

❑ Attach safety chain to an anchor on tractor capable

of pulling drill.

❑ Plug drill safety lights into tractor seven-pin

connector.

❑ Make sure drill is folded properly. See “Folding” on

page 24.

❑ Lock openers up into road position. See “Opener

Lock Up” on page 32.

❑ Secure cylinder lock channels on transport-cylinder

rods and front box lift cylinders. Allow transport lift
cylinders to settle against lock channels. See
Folding” on page 24.

❑ Comply with all national, regional and local safety

laws when traveling on public roads.

❑ Travel with caution.

Point Row Operation (Option)

Refer to Figure 31
The point-row option (page 76) allows you to raise and
lower openers on one drill section independent of the
others. To raise and lower openers on all sections
together, flip power switch

so master-lift-control

light

is on. Raise or lower all openers by moving the

switch under the light.

To raise and lower openers on one section independent
of the others, flip power switch so section-control-light
is lit. Raise and lower openers on a section by moving
the switches under the light.

Note: Turn power switch for point row off when tractor is

off.

Figure 31

Point-Row Control Monitor

17060

1

2

3

Advertising
This manual is related to the following products: