Installing implement harness and sensors, Operator’s manual – Great Plains PM400 Monitor Operator User Manual

Page 28

Advertising
background image

OPERATOR’S MANUAL

PM300, PM332, PM400 Planter Monitors

11001-1372-200606

22 / INSTALLATION

INSTALLING IMPLEMENT HARNESS AND
SENSORS

The implement harness provides custom fit and functions required by the
implement. Each harness branch is labeled for location (row 1, row 2, etc.)
or sensor (lift switch) for routed connection. Some sensors may require
special adapters for connection.

Figure 12
Implement Harness/Sensors

1. Install sensors onto seed tubes using tie-wraps.
2. Route implement harness to the appropriate locations; provide slack

near moving parts to allow for movement. Attach harness to the
implement using tie-wraps.

3. Make sure the hitch connections will connect to the tractor connections

with the proper amount of slack for implement movement.

The harnesses must not obstruct moving parts of the tractor or
implement. Take care when routing harnesses to retain them at
proper locations with adequate slack for movement.

Row

1

Row

2

Row

3

Row

4

Row

5

Row

6

Row

7

Row

8

Implement connector(s)
rows and accessories

Seed sensors

Advertising