Field operation, Field set-up checklists, Field operation field set-up checklists – Great Plains TC5319 (S/N A1420X+) Operator Manual User Manual

Page 24

Advertising
background image

20

TC5109-5323

Great Plains Manufacturing, Inc.

566-224M

03/06/2014

Field Operation

This implement is designed to be pulled in the field with
the machine engaged (including wide turns). Lifting for
short distances to clear residue clogs is acceptable. Lift-
ing for tight turns or reverse moves is required.

Equipment Damage Risk:
Lift for tight turns and reverse moves. Tight turns can result in
a section moving backward. Never back up with harrows on
the ground. If the inside tire stops or rolls backward, the turn is
tight and requires lift.

Field Set-Up Checklists

Use the following tables to develop a final checklist for
your tractor/Turbo-Chisel configuration. Additional or
fewer steps may be necessary depending on tractor fea-
tures, Turbo-Chisel options and planting accessories.

Mechanical Checklist (Tractor Hitching)

Page

Turbo-Chisel hitched

13

Hitch pin locked

Safety chain secured to tractor or leading
implement

13

Parking jack stowed

13

Electrical Checklist

Page

Verify electrical hookups solid, or connec-
tor securely stowed if not using lights in
field.

14

Hydraulic System Checklist

Page

Check tractor hydraulic reservoir full

-

Make hydraulic connections

14

Inspect connections for leaks

-

Unfold Implement

Advertising