Field operation, Field set-up checklists, Field operation field set-up checklists – Great Plains TC5319 (S/N A1420X+) Operator Manual User Manual
Page 24

20
TC5109-5323
Great Plains Manufacturing, Inc.
566-224M
03/06/2014
Field Operation
This implement is designed to be pulled in the field with
the machine engaged (including wide turns). Lifting for
short distances to clear residue clogs is acceptable. Lift-
ing for tight turns or reverse moves is required.
Equipment Damage Risk:
Lift for tight turns and reverse moves. Tight turns can result in
a section moving backward. Never back up with harrows on
the ground. If the inside tire stops or rolls backward, the turn is
tight and requires lift.
Field Set-Up Checklists
Use the following tables to develop a final checklist for
your tractor/Turbo-Chisel configuration. Additional or
fewer steps may be necessary depending on tractor fea-
tures, Turbo-Chisel options and planting accessories.
Mechanical Checklist (Tractor Hitching)
Page
Turbo-Chisel hitched
Hitch pin locked
Safety chain secured to tractor or leading
implement
Parking jack stowed
Electrical Checklist
Page
Verify electrical hookups solid, or connec-
tor securely stowed if not using lights in
field.
Hydraulic System Checklist
Page
Check tractor hydraulic reservoir full
-
Make hydraulic connections
Inspect connections for leaks
-
Unfold Implement
- TC5323 (S/N A1420X+) Operator Manual TC5321 (S/N A1420X+) Operator Manual TC5317 (S/N A1420X+) Operator Manual TC5315 (S/N A1420X+) Operator Manual TC5313 (S/N A1420X+) Operator Manual TC5115 (S/N A1420X+) Operator Manual TC5113 (S/N A1420X+) Operator Manual TC5111 (S/N A1420X+) Operator Manual TC5109 (S/N A1420X+) Operator Manual