Install right cylinder hoses – Great Plains NTA2007HD Installation Instructions User Manual

Page 10

Advertising
background image

10

2014+ Single Fold Marker

Front

Parts

Great Plains Mfg., Inc.

113-921M

Front

Parts

2013-10-16

Install Right Cylinder Hoses

Refer to Figure 13 (depicting the 2013- kit, which has
identical hose routing beyond the cylinder)
49. Select two hoses:

851-106C HH3/8R2 154 9/16FJIC

One with orange tie or “R” tag, and one without.

50. Connect one end of the hose with the orange/R

marking to sequence valve port R.

51. Connect the unmarked hose to sequence valve

port C

52. Route the hoses under the clamp

on the rear

face of the wing lock lug. Leave clamps lightly snug
at this time, to allow for sag and slack adjustment at
step 56.

53. Route the hoses under the clamp

at mid-wing

near the fold cylinder rod end.

54. Route the hoses to the front of the wing, under the

adjustment valve assembly and under the outer
wing clamp

.

55. At the cylinder, connect the orange/R hose to the

elbow fitting

at the rod end.

Connect the unmarked hose to the elbow at the
base end

.

56. Adjust hose sag and slack:

57. Tighten all clamps.

• Allow just enough sag at the wing pivot so that

the hose is near, but no lower than the wing
pivot pin.

• Where the hoses naturally cross each other

at

the cylinder, secure a cable tie.

• Add a second tie approximately 40 cm

(16 inches) away, to bundle the hoses.

• Create enough slack at this location for a loop no

higher than the spring holder

on the marker.

The rod end hose must follow the rod end of the
cylinder as it swings out and toward the rear
during marker extension.

• Balance remaining slack at the adjustment valves

and at the sequence valve.

Check that all slack is clear of moving parts.

Figure 13

Right Cylinder Hose Routing

31346

R

C

1

82

3

2

5

4

6

7

82

1

2

3

4

5

6

7

Advertising