Install right arm assembly – Great Plains NTA2007HD Installation Instructions User Manual

Page 6

Advertising
background image

6

2014+ Single Fold Marker

Front

Parts

Great Plains Mfg., Inc.

113-921M

Front

Parts

2013-10-16

Install Right Arm Assembly

Refer to Figure 7 (which, for clarity, depicts only the arm
subframe

- what is installed is an entire arm assembly)

21. Select one new:

113-918L NTA607 MARKER ASSEMBLY RH

(which is an entire right arm assembly)

To reduce weight during installation, and reduce
arm length during system charge, remove the third
stage arm (

, not shown).

22. Leave in place any straps holding the arm in the

fully folded position. Remove only such straps as
are necessary to free the arm from the shipping
crate or pallet.

Secure the arm in a hoist, with the forward mounting
plate

facing down.

23. Select two new:

806-080C U-BOLT 5/8-11 X 4 1/32 X 6 1/2

and four sets new:

804-022C WASHER LOCK SPRING 5/8 PLT

803-021C NUT HEX 5/8-11 PLT

24. Position the arm assembly

with the mounting

plate

over the right end of the front tool bar

.

Loosely secure with U-bolts

, lock washers

and hex nuts

.

25. Adjust the horizontal position to:

19.84 cm (7

13

16

in,)

measured from the outside face of the wing end
plate to the right side of the subframe

tube.

26. Select two new:

806-157C U-BOLT 5/8-11 X 3 1/32 X 3 1/2

and four sets new:

804-022C WASHER LOCK SPRING 5/8 PLT

803-021C NUT HEX 5/8-11 PLT

27. Using U-bolts

, lock washers

and hex

nuts

, loosely secure the arm subframe

to the

mount plate

.

28. As necessary, adjust the final position of the

mount

so that the arm subframe is parallel to the

wing end plate.

Secure all fasteners to torque spec.

Figure 7

Install Right Arm (Subframe Shown)

31340

1

3

42

27

70

69

65

65

57

57

2

U

D

R

L

F

B

37

37

42

30

1

69

65
57

42

1

2

69

65

57

3

37

70

65
57

70

65

57

37

27

27

Advertising