Install cylinder fittings, Prepare supply hoses, Prepare cylinder hoses – Great Plains NTA2007HD Installation Instructions User Manual

Page 8

Advertising
background image

8

2014+ Single Fold Marker

Front

Parts

Great Plains Mfg., Inc.

113-921M

Front

Parts

2013-10-16

Install Cylinder Fittings

Refer to Figure 10
If elbows are pre-installed on the cylinders

, skip to

step 35.

34. Select four new:

811-065C EL 9/16MJIC 9/16MORB

Loosely install the MORB ends of the elbows at the
cylinder ports.

35. If the elbows

were pre-installed, loosen the jam

nuts.

36. Adjust the orientation of the elbows

so that the

MJIC inlets face toward each other and toward
implement center at roughly a 45

° angle to the

cylinder body. Tighten the jam nuts to ORB torque
spec.

Prepare Supply Hoses

Refer to Figure 11
37. Select two sets new:

851-105C HH3/8R2 100 9/16FJIC 3/4MORB

811-394C CP 3/4FORB MALE QD POPPET TYPE

Install one coupler

on each hose

.

38. If orange cable ties are available, secure one tie to

each hose end near the FJIC fitting. It is not
necessary to separately identify one hose from the
other.

Prepare Cylinder Hoses

39. Select two (of four):

851-106C HH3/8R2 154 9/16FJIC

If orange ties are available, secure one tie to each
hose end near the FJIC fitting. If orange ties are not
available, use tape, tags or indelible marking pen to
identify hose ends or connectors as “R”. These are
the rod-end hoses.

Figure 10

Cylinder Elbows

36056

75

73

75

73

75

75

75

Figure 11

Marker Supply/Return Hoses

36053

81

76

81
76

76

81

82

Advertising