First time field adjustments, Pre-leveling of machine, Front to rear leveling – Great Plains DVN8324 Operator Manual User Manual

Page 41: Pre-leveling of machine front to rear leveling

Advertising
background image

Great Plains Manufacturing, Inc.

Operating Instructions

37

11/25/2013

550-466M

Perform all steps in “Pre-Start Checklist” on page 23

and “Final Field Checklists” on page 36.

Do not make short radius turns with the implement in the
ground.

Note: If you stop in the middle of a pass, raise the imple-

ment and back up 3m (10 ft) before resumption of
tilling.

First Time Field Adjustments

Pre-Leveling of Machine

Note: Pre-leveling of machine should be done on a good

level surface.

Front to Rear Leveling

Refer to Figure 28
1.

Pre-leveling of machine can be done on a concrete
slab or level surface. Lower machine so sweeps are
5.0-7.5 cm (2-3 in) off of ground on the center frame.
Adjust turnbuckle at the front of machine to level it from
front to back. (Shorten to bring front down, extend to
bring front up). Level machine with the front roe just
slightly deeper or lower than the back.

First Pass Operation Checklist

Page

1. Implement unfolded and aligned for first

pass, with coulter disks about 3m before
field edge.

24

2. Pull forward, lower Discovator, and begin

tilling for a short distance.

3. Stop. Assess:

• coulter depth

• shank depth

• finishing attachment operation

4. Make necessary adjustments

37

Sharp Field Turns Checklist

Page

1. Raise Discovator

30

2. Make turn

3. Lower Discovator 3m before field edge

29

4. Resume tilling.

Ending Tilling Checklist

Page

1. Suspend operations as above, then

2. Lift implement

3. Set tractor for fold

25

4. Fold wings

25

5. Place locking valves in transport position

29

6. Place transport locks in transport position

7. Lower implement on to transport locks

8. Lights ON for transport

Figure 28

Hitch Turnbuckle Adjustment

41598

Advertising
This manual is related to the following products: