Refer to Figure 26
73. Slip the end of the hose onto the inlet elbow

(not

visible in photograph) and secure with clamp

.

74. Working back toward the tanks, use cable ties to

secure hose every two feet or so leave ample slack
for folding an unfolding. Do not tie the last four feet of
hose.

75. Leaving ample slack (but no so much that hose

droops below inter-tank tees), cut hose to length and
secure to tee with clamp

.

Ground Drive Deferred Item

The hose to the relief valve is installed after the starter
boom system, at “Pump to Starter Relief Valve Hose
on page 17.

Install High Rate Boom

This section installs most of the components of the 407-
137A kit.

Install the high rate boom first, as it contains components
necessary for installing dual booms.

These instructions presume that the high rate (H.R.)
boom is to be connected to a customer-supplied fertilizer
source, typically a tractor-mounted tank. Tank, strainer,
pump, power source and supply line to the planter are
customer-provisioned and installed.

The high rate boom is presumed to be concentrated fertil-
izer that cannot be applied directly to the seed furrow. The
most likely delivery method is via tubes to zone coulters
at the front of the rows.

Figure 26

Supply Hose At Strainer

27098