Wide center frame assembly – Great Plains 7336 DH Predelivery Manual User Manual

Page 12

Advertising
background image

8

Series II Disk Harrow

Great Plains Manufacturing, Inc.

556-235Q

2014-06-25

Wide Center Frame Assembly

Refer to Figure 5
6.

Lower the left

and right

sides of the center

frame onto stands

.

7.

Install the

3

4

” x 2” Gr. 8 hex bolts

through the 4-

hole tie plates

, secure with

3

4

” lock washers and

3

4

” nuts. Do not tighten at this time.

8.

Pin the torque tube weldment to the center frames
with 1

1

4

” x 9” pins

(outer) and 1

1

4

” x 7” pins

(center). Secure pins with

1

2

” x 2

5

8

” Gr. 8 special

thread bolts

and

1

2

” top lock nuts.

9.

Remove

1

2

” x 4

1

2

” Gr. 5 hex bolt

from the walk-

ing beams. Slide the hub/spindle assembly into the
walking beam and reinstall the hex bolt and secure
with

1

2

” lock nut.

Note: The center uses 380/55R 16.5 tires while the

wings have 12.5Lx15 tires.

10. Install tire/wheel

to hub assembly

with

5

8

” lug

nuts

.

11. Fasten center lift cylinders

, base end to center

frame and rod end to torque tube with pins, machine
washers and cotter pins, provided. Be sure the
washer is installed between the cotter pin and the
cylinder.

12. Tighten all bolts to specs, See “Torque Values

Chart” on page 19.

11

12

13

15

14

16

17

18

19

20

21

22

23

11

12

13

14

15

16

17

18

21

19

20

22

14

23

U

D

F

B

L

R

Figure 5

Wide Center Frame

43448

Advertising