CTA-4000 and 4000HD Installation

This installation requires one of the following kits:
168-408A

CTA4000/HD-8006 (80 row, 6in)

168-409A

CTA4000/HD-6575 (65 row, 7.5in)

168-410A

CTA4000/HD-5010 (50 row, 10in)

Additional installation information is found in the
DICKEY-john IntelliAg Air Cart Control Operator’s man-
ual.

Note: The DICKEY-john manual has only general har-

ness routing for the Great Plains air drills, and
some cable part numbers are slightly different from
those in the kits.

Continuing from step 8 on page 3.

Refer to Figure 18 and Figure 19

9.

Select five (5):

168-465D

DIST TOWER MODULE MOUNT PLATE

At each tower, remove the nuts

and lock washers

at the lower U-Bolt

, and mount the plate

.

Plate orientation is small holes to top, and:

on Towers 1 & 5: extension to drill center
on Towers 2 & 4: extension to drill rear
on Tower 3: extension to left

CTA: Install WSMBs

Start with the left tower (Tower 1).

10. Select one:

467981100S1

INTAG WSMB/FLW MNTR MODULE 18R

and two sets:

802-224C HHCS 1/4-20X1 1/4 GR5
804-006C WASHER LOCK SPRING 1/4 PLT
803-006C NUT HEX 1/4-20 PLT

Mount the WSMB

on the tower side of the plate

, with the mounting ears flush against the plate

and the connector ports facing down.

11. Repeat step 10 for the remaining towers

Figure 18: CTA:

CTA4000 Tower Arrangement

17186

T1

T2

T3

T4

T5

U

D

F

B

L

R

12

1

2

3

12

Figure 19: CTA:

Module Mount

27058

12

39

14

16

15

3

2

1

39

14

16

15

39

12