4

Blockage Monitor Kits

168-414M

10/29/2008

3N-4010HDA Installation

This installation requires one of the following kits:
168-411A

3N4010HDA-6675 (66 row, 7.5in)

168-412A

3N4010HDA-4810 (48 row, 10in)

If installation is being done on a new 3N-4010HDA, use
the instructions in the 196-444Q Pre-Delivery manual.
The instructions in this manual (168-414M) presume a
drill originally delivered and setup without blockage.

Additional installation information is found in the
DICKEY-john IntelliAg Air Cart Control Operator’s man-
ual.

Note: The DICKEY-john manual has only general har-

ness routing for the Great Plains air drills, and
some cable part numbers are slightly different from
those in the kits.

Refer to Figure 4 and Figure 5

9.

Select six (6):

168-465D

DIST TOWER MODULE MOUNT PLATE

At each tower, remove the nuts

and lock washers

at the lower U-Bolt

, and mount the plate

.

Plate orientation is small holes to top, and:

on Towers 1 & 6: extension to drill center
on Towers 2 & 5: extension away from drill center
on Towers 3 & 4: extension to drill rear

3N: Install WSMBs

Start with the left tower (Tower 1).

Refer to Figure 4 and Figure 5

10. Select one:

467981100S1

INTAG WSMB/FLW MNTR MODULE 18R

and two sets:

802-224C HHCS 1/4-20X1 1/4 GR5
804-006C WASHER LOCK SPRING 1/4 PLT
803-006C NUT HEX 1/4-20 PLT

Mount the WSMB

on the front of the plate

,

with the connector ports down.

11. Repeat step 10 for the remaining towers.

The WSMB orientation is:
on Wing towers (

Figure 4

):

connectors down, module to front

on Center towers (

Figure 5

):

connectors down, module to center

Figure 4: 3N:

Tower 2 Module Mount

27058

12

39

14

16

15

3

2

1

12

1

2

3

12

Figure 5: 3N

Tower 3 Module Mount

28182

12

39

14

16

15

3

2

1

39

14

16

15

39

12