3n: salvage harness, 3n: install wsmb harnesses, Apped at step 25 – Great Plains NTA3510 Installation Instructions User Manual

Page 7: Ud l r

Advertising
background image

Great Plains Mfg., Inc.

Installation Instructions

7

10/29/2008

168-414M

3N: Salvage Harness

Refer to Figure 12

The existing monitor harness on the drill simply routes
the bus from front to rear hitch, and consists of three
cable assemblies. The blockage sensor system “splices”
into the harness. Two existing cables are re-positioned.

22. Remove and save:

467980141 10’ EXT HARNESS

23. Locate cable:

467980130 40’ HITCH HARNESS

Leave it secured to the tongue, but release it from
straps or ties on the drill frame.

Note: The rear hitch cable:

467980360 3’ REAR HITCH HARNESS

is left in place.

3N: Install WSMB Harnesses

Start with Tower 1 (left wing, left tower)

Refer to Figure 13

24. Select one:

467981201 INT AG HARNESS, WSMB MOD-

ULE

Join the row harness connector

to the mating

connector on the row harness

.

Plug the WSMB connectors

into the WSMB

.

These connectors are not interchangeable, and are
keyed to ensure correct insertion.

Refer to Figure 10 on page 6

25. Select two:

800-082C CABLE TIE .31X21.5 6DIA 120LB

Coil up excess row harness leads and tie the bundle
to the tower, above and below the lower U-bolt.

26. Repeat step 24 and step 25 for each tower.

Figure 12: 3N:

Harness Route (w/o Blockage)

28443

92

93

94

U

D

F

B

L

R

93

92

94

Figure 13: 3N:

WSMB Harness

28200

40

1

2

31

30

40

39

3

4

5

U

D

L

R

40

1

31

2

39

13

Advertising