Table 2.3. rear connections – Bio-Rad PDS-1000 / He™ and Hepta™ Systems User Manual

Page 15

Advertising
background image

Table 2.3. Rear Connections

Refer to Figure 2.10 for a rear perspective view of the unit.
Helium Connection to Gas Tube

Connects top of Gas Acceleration Tube to plastic

tubing from Solenoid Valve, supplying high pres-

sure helium.

Over-Pressure Relief Valve

Opens at 0.5 psi chamber pressure to relieve

accumulation of gas. A new safety feature.

Automatically resets after activation.

Vacuum Line, Chamber to Controls Supplies vacuum to chamber from control valves.
Helium Metering (Solenoid) Valve

Supplies electric power to 3-way Solenoid Valve

Electrical Connection

in helium line. Plug the three-pin connector from

the Solenoid Valve into this receptacle.

Line Cord Electrical Connection

Supplies electric power to Biolistic unit from

house line. Plug connector from Line Cord into

this receptacle.

Vacuum Line, Connection to Source Connects unit to house vacuum supply or vacuum

pump via fittings included. Feeds into vacuum

flow controls.

Fig. 2.10. Rear view of main unit, component connection points.

12

Vacuum Port / Clamping Ring

Attachment Site

6.0 ft. PEEK Tubing

(connects to helium regulator)

2.5 ft PEEK Tubing

(connects to gas

acceleration tube)

Metering (solenoid)

Valve Power Cord

(connects to rear

of main unit)

Helium Pressure

Regulator

Adjustable

Metering Valve

Main Unit Power

Cord Socket

Over-Pressure Relief Valve

Vacuum (reinforced PVC)

Tygon

®

Tubing

Advertising