Section 3 | programming, Opening and closing the lid, Turn unit on – Dako Hybridizer User Manual

Page 16: Overview

Advertising
background image

16

Dako Hybridizer

|

Handbook

Section 3 |

Programming

Opening and Closing the Lid

The plate may be hot. Use caution and check temperature on display before handling slides.
Improper precaution can cause a burn.

Depressions located on either side of the lid allow user to lift lid into position. The lid should offer

some resistance when opening. To close reverse process, assure front is completely down and no
obstructions prevent gasket seal from sealing on housing base.

Turn Unit On

The Hybridizer main power switch is located on the rear panel. Assure unit is plugged into the appropriate
outlet. Move switch to “ON” position. Instrument will beep to announce power has been turned on, fan
and heating will start and the Main Menu will be displayed when the instrument has reached the default
temperature of 37°C.
I = ON O=OFF

Overview

Hybridizer is capable of storing 40 different programs. Each program can be one of three program types:

ƒ

Denaturation and Hybridization (Denat & Hyb),

ƒ

Hybridization Only (Hyb Only) or

ƒ

Fixed Temperature (Fixed Temp).



Programming is simple. Select program type, and follow screen prompts to enter run times and set
temperatures. Hybridizer maintains set temperatures for duration of the processing.

Note: At the end of the program the display will show “Process Complete”. Temperature will be
maintained and timer will continue to run until End PGM/Main Menu is accepted by pressing “Enter”
button.

Run a PGM
Edit a PGM
Create a PGM
Present Temp: 37°C

Select PGM Type
Denat & Hyb
Hyb Only
Fixed Temp

Advertising