When required), 98 strike installation, Strike hook installation – Detex Delayed Egress With Magnetic Lock User Manual

Page 15

Advertising
background image

(when required)

98 strike

Door

Mullion Post

99 Strike

Strike Hook

Align the strike with

Firmly tighten screws

the latchbolt.

Door

Door

98 STRIKE INSTALLATION

Shim (if necessary)

98 Strike

Shield (if necessary)

Cutout per

Door frame

STRIKE HOOK INSTALLATION

98 Strike Locator

(Caution: This installation is required on fire rated door openings with removable mullion.)

For mounting hole locations use Strike Locator Template provided.

#25 or 9/64"

tap 10-24

#22 or 5/32"

pilot hole

#10 Sheetmetal screw

DRILL CHART

10-24 Machine screw

Mark and drill holes as necessary.

#7 for 1/4-20 machine screws,

For #14 self-drilling screws, no pilot

hole necessary.

7/64" for 6-32 machine screws,

9/64" for #6 sheetemtal screws

(see fastener table)

103182 Page 15

Advertising