R frame installation, Fig. #8 6) dj16 drill guide – EFCO 406 (T) Series User Manual

Page 15

Advertising
background image

B - SHEAR BLOCKS AT SCREW

SECTION III FABRICATION

SPLINE DOOR JAMB

LOCATE TOP EDGE OF

DRILL JIG AT THE

TOP OF THE T-BAR

NOTE: The drill jig is reversible

#4 Drill (.209 dia.),

(2) holes are located

on center, per transom bar end.

This prep is in conjunction with

the C.O.C. 'F' clip or FT16 angle.

Use #K996 shear block pkg.

FIG. #8

6) DJ16 DRILL GUIDE

per shear block.
Use # K977 shear block pkg.

TO FINISHED FLOOR

2"

(4) holes are located

# 26 Drill (.147 dia.),

TRANSOM BAR SHEAR BLOCK TO DOOR JAMB
WITH A C.O.C - SINGLE OR PAIRS OF DOORS

for left and right positions.

Locate this block to

the interior edge of

the door jamb.

drill guide to locate the

hole pattern for the shear

blocks.

(CONT.)

Use the top edge of the

PAGE 13

DPS 12/2002

406 STOREFRONT

Advertising