Shear block fabrication, C- shear block fabrication - frames, At tubular intermediate horizontal – EFCO 406 (T) Series User Manual

Page 16: Fig. #9 1) dj18 drill guide application, Fig. # 10, And open back sill, Horizontal and sill end prep for attachment to, Shear blocks

Advertising
background image

C- SHEAR BLOCK FABRICATION - FRAMES

KN65 FOR 9357 SILL

K977 FOR 8401 HORIZ./SILL

AT TUBULAR INTERMEDIATE HORIZONTAL

HORIZONTAL AND SILL END
PREP FOR ATTACHMENT TO

wall using #2 drill (.221 Dia).

Drill as indicated thru one

Fig. #9

1) DJ18 DRILL GUIDE APPLICATION

#8401 AT HORIZONTAL

1.000

2.656

.567

LOCATE ON

GUIDE TRACK

.221 DIA.

DRILL

DJ18

Fig. # 10

DJ18

SECTION III FABRICATION

DRILL

.221 DIA.

SHEAR BLOCKS

406 STOREFRONT

DPS 4/2004

PAGE 14

AND OPEN BACK SILL

Advertising