Hp-175-225 22 – Oldcastle BuildingEnvelope HP-175 User Manual

Page 22

Advertising
background image

SEAL CLIP

POCKET AT EACH

END OF BRIDGE

9/16"

GUTTER

TOWARDS

SHOWN BELOW.

SYMMETRICAL, INSTALL AS

CLIPS ARE NOT

NOTE:

HP-10 GLAZING CLIPS USED

AT CAPTURED JAMB.

HP-8 CLIPS TO BE USED

AT ALL HORIZONTALS.

INSTALL CLIPS AT A

MAXIMUM OF 12" O.C.

RUN SEALANT ACROSS

FACE OF MULL AND TOP

OF HORIZONTALS

HP175-FP-61 (1")

HP175-FP-68 (1/4")

BRIDGE

REFERENCE SHEET #9

FOR JAMB BRIDGE INSTALLATION

SEAL ACROSS FACE

OF BRIDGE AT

DRIP LEG

1) BED FACE OF MULL

AND TOP OF HORIZONTALS

WITH SEALANT.

2) SET BRIDGE INTO PLACE. HOOK

OVER DRIP LEGS AND ROTATE INTO

PROPER POSITION.

3) SEAL AND TOOL ACROSS

FACE OF MULL AND HORIZONTALS

4) SEAL CLIP POCKET AT EACH END

OF BRIDGE

5) SEAL ABOVE AND BELOW DRIP

LEG OF HORIZONTALS

INTEGRAL DIVERTER HORIZONTAL BRIDGE INSTALLATION

FOR BUTT GLAZE MULLION

H P - 1 7 5 / 2 2 5 I N S T A L L A T I O N M A N U A L

22






Advertising