Hp-175-225 09, Integral diverter horizontal bridge installation – Oldcastle BuildingEnvelope HP-175 User Manual

Page 9

Advertising
background image

9/16"

TOWARDS

GUTTER

HP-10 CLIPS USED ON VERTICALS

OF 1" SYSTEM.

HP-8 CLIP TO BE USED ON

HORIZONTALS OF 1" SYSTEM

AND TYPICALLY ON 1/4"

SYSTE M.

RUN SEALANT ACROSS

FACE OF MULL AND TOP

OF HORIZONTALS

HP175-FP-43 (1")

HP175-FP-47 (1/4")

HP225-FP-4 (1")

HP225-FP-7 (1/4")

BRIDGE

1) BED FACE OF MULL AND TOP OF HORIZONTALS WITH

SEALANT.

2) SET BRIDGE INTO PLACE. HOOK OVER DRIP LEGS

AND ROTATE INTO PROPER POSITION.

3) SEA L AND TOOL ACROSS FACE OF MULL AND

HORIZONTALS

4) SEAL CLIP POCKET AT EACH END OF BRIDGE

5) SEAL ABOVE AND BELOW DRIP LEG OF

HORIZONTALS

SEAL ACROSS FACE

OF BRIDGE AT

DRIP LEG

SEAL CLIP

POCKET AT EACH

END OF BRIDGE

1" DIVERTERS

HP175-FP-44/45

HP225-FP-5/6

BED IN SEALANT

AND SEAL TOMULL

AND HORIZONTAL

JAMB BRIDGE

GLAZING CLIPS SH OULD BE

LOCATED AT A MAXIMUM OF

12"O.C.

NOTE: CLIPS ARE NOT SYMMETRICAL,

INSTALL AS

SHOWN BELOW.

1/4" DIVERTERS

HP175-FP-43 MODIFIED

HP225-FP-7 MODIFIED

BED IN SEALANT

AND SEAL TOMULL

AND HORIZONTAL

CUT DIVERTER TO FIT

INTO POCKET TERMINATOR

AND NOTCH AS SHOWN

INTEGRAL DIVERTER

HORIZONTAL BRIDGE INSTALLATION

H P - 1 7 5 / 2 2 5 I N S T A L L A T I O N M A N U A L

9






Advertising