Welch Allyn Acuity LT Mobile - Installation Guide User Manual
Page 26

22
Chapter 4 Install the system
Welch Allyn Wireless Acuity LT Central Monitoring System
To apply power to Acuity LT System components
1.
Apply power in this order:
a.
Printer
•
Insert the toner cartridge and add paper.
•
Plug into AC power.
Do not plug the printer into a UPS.
•
Turn on the printer power.
b.
UPS 1
•
Plug the UPS 1 power cord into an AC power outlet.
•
Press the UPS 1 power buttons to apply power to the switch, PoEs and APs.
c.
If your system includes 4-7 APs, repeat the steps in
for the additional UPS.
d.
UPS 2, CPU and Acuity LT Central Station display(s)
•
Plug the UPS 2 power cord into an AC power outlet.
•
Press both UPS 2 power buttons to apply power.
If the CPU does not start up, press the front-panel power button.
•
Turn on the Acuity LT Central Station display power.
•
For a 28-patient system, also turn on the second display.
2.
Verify that LEDs are active on the following devices:
•
UPSs
•
CPU
•
Switch
•
PoEs
•
APs