Welch Allyn Acuity LT Mobile - Installation Guide User Manual
Page 27

Installation Guide
Chapter 4 Install the system
23
To check information on the Acuity LT Central Station display
1.
Confirm that information appears on the Acuity LT Central Station display.
For a 28-patient system, additionally do the following:
a.
Confirm that information is displayed on the second display.
b.
Using the Acuity LT System trackball, confirm that the displayed arrow moves left
and right between the displays.
If it does not, reverse the cable connections at the rear of the displays, and test
again.
2.
Within two or three minutes, confirm that the Acuity LT Central Station display shows
a window similar to the following:
If a CHECK NETWORK message is displayed, check all of the power and data cable
connections to the CPU, switch, APs and PoEs. If the message is still displayed, refer
to
For a 28-patient system, additionally confirm that the map in the lower left corner
shows room icons for 28 monitors.
3.
Apply power to a Micropaq, Propaq LTR or wireless Propaq CS patient monitor.
Verify that no patient cables are connected to the monitor, such as ECG or SpO
2
cables.