Installation tasks, Recommended tools and supplies, Rapidrails rack kit contents – Dell PowerVault 770N (Deskside NAS Appliance) User Manual

Page 10: Installation tasks -4, Recommended tools and supplies -4, Rapidrails rack kit contents -4

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Installation Tasks

Installing a rack kit involves performing the following tasks in their numbered order:

Removing the rack doors

Marking the rack

Installing the rail assemblies in the rack:

RapidRails installation

VersaRails installation

Installing the system in the rack

Installing the cable-management arm

Routing cables

Replacing the rack doors

Recommended Tools and Supplies

A #2 Phillips screwdriver

A T-10 Torx driver (if installing the tower-to-rack kit)

Masking tape or a felt-tip pen, for use in marking the mounting holes to be used

A measuring ruler or tape measure

RapidRails Rack Kit Contents

The RapidRails rack kit includes the following items (see Figure 1-1):

One pair of RapidRails slide assemblies

One cable-management arm

One cable tray

Four 6-32 x 0.25-inch hex-head Phillips screws

1-4

I R a c k I n s t a l l a t i o n G u i d e

Advertising