1 installation clearances, 2 setting the unit, Benchmark 2.0ln dual-fuel low nox boiler – AERCO BMK 2.0 LN Dual Fuel Serial G-11-2402 and UP User Manual

Page 12: Gf-127

Advertising
background image




CHAPTER 2: INSTALLATION

Page 12 of 160 PR2: 04/22/13

Benchmark 2.0LN Dual-Fuel Low NOx Boiler

Operation and Maintenance Manual

OMM-0052_0E

GF-127

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 • Ph: 800-526-0288

• Access to AC Input Power at 120 VAC, Single-Phase, 60 Hz @ 20 Amps
• Access to Natural Gas line at a minimum supply gas pressure of 8.5" W.C.
• Access to Propane line at a minimum supply gas pressure of 8.5” W.C.

Installation Clearances

2.4.1

The unit must be installed with the prescribed clearances for service as shown in Figure 2-1.
The minimum clearance dimensions, required by AERCO, are listed below. However, if Local
Building Codes require additional clearances, these codes shall supersede AERCO’s
requirements. Minimum acceptable clearances required are:

• Sides: 24 inches
• Front : 24 inches
• Rear: 30 inches
• Top: 18 inches

All gas piping, water piping and electrical conduit or cable must be arranged so that they do not
interfere with the removal of any panels, or inhibit service or maintenance of the unit.

44.5"

18"

79"

101"

4" HIGH PAD

24"

24"

30"

24"

REAR

FRONT

Figure 2-1: Benchmark 2.0LN Boiler Clearances

WARNING

KEEP THE UNIT AREA CLEAR AND FREE FROM ALL
COMBUSTIBLE MATERIALS AND FLAMMABLE VAPORS OR
LIQUIDS.

CAUTION

While packaged in the shipping container, the boiler must be
moved by pallet jack or forklift from the FRONT ONLY.

Setting the Unit

2.4.2

The unit must be installed on a 4 inch to 6 inch housekeeping pad to ensure proper condensate
drainage. If anchoring the unit, refer to the dimensional drawings in Appendix F for anchor

Advertising