10 start/stop levels, Control panel operating procedures – AERCO BMK 3.0 LN Dual-Fuel Series Gas Fired Low NOx Boiler System User Manual

Page 32

Advertising
background image

CONTROL PANEL OPERATING PROCEDURES

3-10

25

TO

B

LO

W

E

R

A

IR

IN

DIAL

(DETAIL “A”)

STEPPER

MOTOR

DETAIL “A”

Figure 3-6.

Air/Fuel Valve In Ignition Position


6. Up to 7 seconds will be allowed for ignition

to be detected. The igniter relay will be

turned off one second after flame is

detected.

7. After 2 seconds of continuous flame, Flame

Proven

will be displayed and the flame

strength will be indicated. After 5 seconds,

the current date and time will be displayed in

place of the flame strength.

8. With the unit firing properly, it will be

controlled by the temperature controller

circuitry. The boiler’s

VALVE POSITION will

be continuously displayed on the front panel

bargraph.


Once the demand for heat has been satisfied,

the Control Box will turn off the dual SSOV gas

valves. The blower relay will be deactivated and

the Air/Fuel Valve will be closed. Standby will

be displayed.

3.10 START/STOP LEVELS

The start and stop levels are the Air/Fuel Valve

positions (% open) that start and stop the unit,

based on load. These levels are Factory preset

as follows:
Nat. Gas Propane
Start Level: 25% 25%
Stop Level: 20% 21%
Normally, these settings should not require

adjustment.
Note that the energy input of the boiler is not

linearly related to the Air/Fuel Valve position

(% open). Refer to Table 3-7 for the relationship

between the energy input and valve open

position (%) for a unit running on Natural Gas.

Table 3-7

Relationship Between Air/Fuel Valve Position and Energy Input

Air/Fuel Valve

Position

(% Open)

Energy Input

(BTU/HR)

Boiler Energy Input

(% Of Full Capacity)

0

0

0

10

0

0

20

287,000

10%

30

486,000

16%

40

802,000

27%

50

1,180,000

39%

60

1,720,000

57%

70

2,300,000

77%

80

2,550,000

85%

90

2,720,000

91%

100

3,000,000

100%