BASO BGH2UNCNTRLHT-01 User Manual

Page 12

Advertising
background image

12

BGH2UNCTRLHT-01 Universal Hot Surface Ignition Control Installation Instructions

No

Yes

Power On

Initialize software,

test ROM, RAM and E2

get voltage and

frequency

Check for flame

sense stuck on

Do pre-purge delay

blink LED .5 sec. on/off

continuously check

gas valve feedback to

assure valve is off

Perform hot surface

igniter short test, turn
on hot surface igniter

Continuously check

gas valve feedback and

HSI current

After required delay

turn on gas valve

HSI

timeout?

Turn off HSI

Gas valve

timeout?

No

No

Check flame, read

flame detect circuit

7X @ 100 MSEC apart

Yes

Flame

detected?

Turn off all relays.

Do between trial purge

blink LED .5 sec. On/off.

Continuously check

gas valve feedback to

assure valve off.

Note:

If the thermostat opens,

the control will turn off valves
and returns to the idle state.

Test ROM, RAM, E2, and line.

Test gas valve relay

feedback voltage.

Good flame LED on solid.

Weak flame LED 2 blink.

OK

Flame

detected?

Yes

No

Yes

No

RELIGHT

Yes

Flame bad
7 readings

Lockout

Lockout

Lockout

Lockout

Lockout

Lockout

Lockout

Lockout

Lockout

Lockout

Error

OK

Error

OK

Error

OK

Error

OK

Error

OK

Continuously check

gas valve feed back and

HSI current

Lockout

Lockout

Wait 0.1 second

FLAME LOST, TURN

OFF GAS VALVE AND

TRY TO RELIGHT

Note:

Error Codes

If the controller is flashing an error code, the control

will be in lockout. The controller will stay in lockout and continue
flashing an error code until power is cycled. If an error code repeats,
then see Table 3 Troubleshooting Guide to determine
the problem.

Flame Error
Gas Valve Error
Line Voltage/Frequency Error
Processor Errors

Red Flash Code
1 Blink
3 Blinks
4 Blinks
5 Blinks

Error Type
Lockout
Lockout
Stand By
Lockout

Figure 4

: Sequence of Operation Flow Chart

Advertising