g) Push the inner vent pipe onto the termination inner pipe or appliance adapter all the way up to

the stop bead.

h) Tighten the inner pipe clamp bolts until both clamp halves are within 1/8” of each other at each

end (Figure 9c).

i) Slide the cover sleeve and cover ring together to engage the ring in the groove of the sleeve, and

tighten the cover sleeve clamp (Figure 9d).

j) To maintain 3” clearance to combustibles, wrap minimum 1-1/2” thick ceramic insulation

(installer-supplied) around the exposed portion of the termination inner pipe (Figure 9d), and

secure with foil tape (installer supplied).

k) Allow sealant to cure for at least one hour before firing boiler.

l) Use the same procedure to install vent pipe on Reducing Tee (Figure 9e).

8) AIR INTAKE PIPE INSTALLATION

a) Attach flexible air intake pipe to the terminal and the collar on the burner and secure it with the

hose clamps provided.