Crown Boiler ODV-125 User Manual

Page 22

Advertising
background image

19

19

IX Start-up and Checkout

Use the following procedure for initial start-up of the boiler:

1) Make sure that the boiler and system are filled with water.

2) Check all system and fuel piping for leaks. Repair any leaks found immediately.

3) Vent system must be complete and free of obstructions before attempting to fire boiler. Do not

fire boiler until all vent sealant has had at least one hour to cure.

4) Inspect all line voltage wiring for loose or un-insulated connections.

5) If the boiler is connected to a one-pipe system, purge the suction line in accordance with the

instructions supplied with the pump.

WARNING

• If antifreeze is used in the system, it must be a nontoxic type such as propylene

glycol.

• Never attempt to fill a hot empty boiler

• Make sure that the area around the boiler is clear and free from combustible

materials, gasoline, and other flammable vapors and liquids.

CAUTION

• Safe reliable operation of this boiler requires that the burner be checked and

adjusted by a qualified oil serviceman using combustion test instruments

• Do not drill a hole in the vent system to take combustion gas samples. Take

combustion gas samples through the bolthole on the top of the 7 x 4 adapter.

Advertising
This manual is related to the following products: