Installation, Field-supplied hardware – Carrier RTU OPEN 11-808-427-01 User Manual

Page 11

Advertising
background image

RTU Open

5

To install the RTU Open:

1

Mount the controller (page 6).

2

Wire the controller for power (page 7).

○

Using the rooftop equipment control power transformer (page 8).

○

Using an auxiliary control power transformer (page 8).

3

Set the controller's address (page 9).

4

Wire inputs and outputs (page 12).

5

Wire sensors to the controller (page 18).


Field-supplied hardware

An RTU Open retrofit installation may require the following field-supplied components:
•

wiring harness: Part #OPN-RTUHRN

•

transformer – 24 Vac, 20 VA minimum

•

wiring

Application-dependent components:
•

carbon dioxide sensors

•

damper/damper actuator

•

differential pressure switch

•

enthalpy switch

•

fan status switch

•

door switch

•

fan section door switch

•

relative humidity sensor

•

remote occupancy contact

•

smoke detector

•

temperature sensors


Installation

Advertising