New England Arbors VA84254 User Manual
Page 7
Advertising
6
7
8
4
5
4
7
1915 Dove St., Port Huron MI USA 48060
Toll Free Phone: 1 800 282 9346 Toll Free Fax: 1 877 464 9286
www.newenglandarbors.com
S T E P F I V E
8
Level
Place the arch assembly over and into the side panel posts.
(You will need a helper).
Run a bead of glue around the post just under the arches.
Slide the post trims up and hold them in place momentarily
to allow the glue to set.
Fasten four 1 1/2in screws into each side of the post just below
the post trim.
Level the arbor both horizontal and vertically.
Backfill the holes with either gravel or cement.
6
5
9
9
7
Advertising