Hotcup operators’ guide initial setup – CMS Products 674 User Manual

Page 29

Advertising
background image

HotCup Operators’ Guide

Initial Setup

November, 2007

23

6740001

l.

Test the brewer to be sure the paper feeds properly: On the service keypad, press

,

then press

until the display shows BREW TEST.

i.

Press

to test each brewer position:

WARNING

Keep away from the brewer mechanism while it is operating.

Coming into contact with moving parts could injure you.

BREW 'R BREW The brewer is in the clamp position.

BREW 'R HOMe The brewer is in the open position.

ii. Make sure the filter paper feeds properly without jamming.

iii. Replace the cup station and grounds bucket.

5.

Install the Optional Coin Box Lock

a. Install the lock cylinder, washer, and nut in the

order shown.

b. Tighten the nut.

c. Install the lock bar as shown, and secure with

the screw.

6.

Set Up and Load the Coin Mechanism

Standard Coin Mechanism

Setting the Quarter Switch. If your coin
mechanism is not a MARS TRC 6000, skip this
procedure and begin LOADING THE COIN
MECHANISM.

a. Flip down the front of the coin mechanism as

shown, and set the quarter switch.

Load the Coin Mechanism.

a. Open the cabinet door and the monetary door.

b. Insert coins into their respective tubes until each tube has been filled.

c. Inspect the tubes for shingled coins and correct if necessary.

LOCK BAR

SCREW

NUT

WASHER

LOCK
CYLINDER

626P0011

Advertising
This manual is related to the following products:

676