Using vector dynamics foundation systems – Tie Down Vector Dynamics Foundation System for Wind Zones lll User Manual

Page 17

Advertising
background image

D103

0

Tie Down Engineering

255 Villanova Drive SW

Atlanta, Georgia 30336

(404) 344-0000 • Fax (404) 349-0401

www.tiedown.com

Example of a Double Section 28' x 72' Home

WIND ZONE I for Double Section Homes (High Pier Sets)

Using Vector Dynamics Foundation Systems

Soil Bearing Capacity: 1,000 PSF Minimum

Anchors Required:

30" with 2-4" helix anchors (#59095), 12" Stabilizer Plates (#59292)

& 1-1/4" frame tie with connector

Home Length

Vector Systems

Anchors Required

Longitudinal

Required

Per Side

System (LSD)*

0 to 48'

2

2

2 (4 Struts)

49' to 71'

3

3

2 (4 Struts)

72' to 84'

4

4

2 (4 Struts)

85' to 90'

5

5

2 (4 Struts)

NOTES:
Pier height is measured from top of the Vector Pad to the
bottom of the I-beam. Vector Systems should be spaced
as symmetrically as possible along the length of the home.
Pier spacing must be consistent with home manufacturers
instruction and/or state requirements.

Maximum allowable working load for metal strut: 3150 lbs.

* One Longitudinal Vector System is made up of 2

struts, which can be used separately.

Vector System

LSD

LSD

Vector System

Anchors &

Stabilizer Plates

Unit Width

See below

chart

I-Beam

Spacing

45˚

Min.

156”

156”

156”

164”

164”

164”

180” Min

180” Min

180” Min

140” Min

140” Min

140” Min

82.5”

95.5”

99.5”

82.5”

95.5”

99.5”

82.5”

95.5”

99.5”

82.5”

95.5”

99.5”

88”

70”

65”

98”

81”

76”

119”

101”

96”

66”

48”

43”

86”

69”

64”

96”

80”

74”

117”

100”

95”

64”

47”

42”

85”

68”

63”

95”

78.5”

73”

115”

99”

94”

64”

47”

42”

Wall Height & Trib

Max. Pier Height

7.0’

Trib=19’

7.5’

Trib=18’

8.0’

Trib=17’

Unit

Width

W

I-Beam

Spacing

IBS

Wind Zone I

17

Revised: 8/19/08