Tie Down Vector Dynamics Foundation System for Wind Zones lll User Manual

Page 19

Advertising
background image

D103

0

Tie Down Engineering

255 Villanova Drive SW

Atlanta, Georgia 30336

(404) 344-0000 • Fax (404) 349-0401

www.tiedown.com

Example of a Double Section 28' x 72' Home

Longitudinal (LSD)

Longitudinal (LSD)

Vector Systems

Anchors

Wind Zone II

WIND ZONE II for Double Section Homes

Using Vector Dynamics Foundation Systems

Home Length

Vector Systems

Anchors Required

Longitudinal

Required

Per Side

Systems

1

(LSD)

0 to 48’

4

4

2 (4 Struts)

49’ to 60’

5

5

2 (4 Struts)

61’ to 72’

6

6

2 (4 Struts)

73’ to 84’

7

7

2 (4 Struts)

85’ to 90’

8

8

2 (4 Struts)

NOTES:
Vector Systems should be spaced as symmetrical as
possible along the length of the home. Pier spacing must be
consistent with home manufacturers instruction and/or state
requirements.

Maximum allowable working load for metal strut: 3150 lbs.

1

One Longitudinal Vector System is made up of 2

struts, which can be used separately.

Soil Classifications:

2, 3, 4A & 4B

Soil Bearing Capacity:

1,000 PSF Minimum

Anchors Required:

30" with 2-4" helix anchors (#59095) with 1-1/4" Vertical Ties

19

Revised: 8/19/08

Advertising