VACUUBRAND CVC 3000 User Manual

Page 44

Advertising
background image

page 44 of 80

Program step 1 should be always a definite initial state, here atmospheric

pressure (ATM). To reach this state definitely, set a tickmark at ”Vent.”

and ”Step” by pressing the selection knob.

In step 2, pumping begins, attempting to reach 300 Torr/mbar as quickly

as possible (”Step”). Vacuum holds there for 10 minutes (degassing the

solvent).

In step 3, ”Auto

” causes an automatic search of a boiling point in

the pressure interval between 300 Torr/mbar/hPa (depending on preset

pressure unit) and 2 Torr/mbar/hPa, followed by automatic adaptation to

changes in the boiling point. The following step starts either (1) once the

cumulative process time reaches the set limit (1 hour/60 minutes), even

if the preset pressure (2 Torr/mbar/hPa) has not been reached, or (2) if

a vacuum of 2 Torr/mbar/hPa is reached, even if the preset time has not

been completed.

Step 4 vents to atmospheric pressure as fast as possible and switches off

the control after one minute.

Example 2

Vacuum pump with in-line valve and/or Vacuum-Management-Sys-

tem Module A: Pumping down with intermediate venting

Program step 1 should be always a definite initial state, here atmospheric

pressure (ATM). To reach this state definitely, set a tickmark at ”Vent.”

and ”Step” by pressing the selection knob.

Program

No hh:mm:ss Vac Vent. Step

01 00:00:00 ATM ✔ ✔

02 00:05:00 10

03 00:15:00 10

04 00:01:00 500 ✔

05 00:09:00 500 ✔

06 00:10:00 5

07 00:20:00 5

08 00:01:00 ATM ✔ ✔

09 00:00:00

10 00:00:00

- - - - - - - - - - - - - Back - - - - - - - - - - - - - -

01:01:00

Advertising