Ockin – Carrier 30HK User Manual

Page 2

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Table 1 — Weight Distribution (ib)

UM!T

30( )--

APPROX

OPERWT

HK

HL

HK

HL

A I B

C

D

A

B

C

D

015

1637

1016

142j 201

755 539

266 266 242 242

020

1787

1136

182| 240

790 575

296 296 272 272

025

1980

1310

3031 205

592 880

367 285 285 373

030

1985

1334

3031 205

592 885

377 290 290 377

Location of mounting holes:

WATER

i

INLET

1

PLAN VIEW

i

END

FRONT

SC

l

F-I

l

OCKIN

ö

0OLT

J_

SNOb&ER Ft.ANo>--0
WASHER

NEOPHENE

SNUSSKR

'COMPRESSOR FOOT

ISfL A'lON S-RING

Fig. 2 — Compressor Mounting

To ensure safe moving, unit should remain on

shipping skid until final placement. If unit is moved
on rollers, use minimum of 3. Unit can also be
dragged into final position (must be on skid).

When rolling or dragging, apply force to the skid,

not the unit. Use care to avoid damage to piping and

control box.

PLACEMENT

When unit is in final position, remove skid, level

unit with a spirit level and bolt to floor or pad.

These units are not suitable for unprotected

outdoor use.

Carrier recommends that these units be located

in the basement or on the ground floor. However,
if it is necessary to locate unit on an upper floor,
be sure the structure has been designed to support
the weight. If necessary, add structural support to
floor. Also, be sure surface for installation is level.

Refer to Fig. I for space requirements and Table 1

for weight distribution.

1090

Advertising